The location and layout of Derby Dining Hall required every fabricated piece to be lifted on a boom, under the building’s new facade and through a second story window.
This effort required Servco to construct a special platform for the fab so that it could be tilted forward or backwards and not slide off the boom lift.
Call (314) 781-3189 or fill out the form below and tell us about your commercial foodservice project.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
© 2024 Servco | Privacy Policy | Terms and Conditions